Huitian has a fully automatic production line for construction adhesives and the capacity can reach 15,000MT/Year .Introdcution of HT611
Construction Adhesive HT611 structural bonding epoxy sealant,neutral curing sealant,, building adhesive
HT611 is two-component, light yellow, paste, room temperature curing structural bonding epoxy sealant. It is dedicated used for dry-hang stone
Properties
Test item | Index | |
Appearance | A component | White paste |
B component | Light yellow thixotropic paste | |
Mixture | Light yellow paste | |
Applicable period | Min | >30-90 |
Shear strength (steel-steel, MPa) |
A+B (1:1) |
>8 |
>8 | ||
Compression and shear strength MPa |
Stone-stone | Standard condition 48h >10.0 |
Soaking 168h >7 | ||
Heat Treatment 80℃168h >7 | ||
Thawing cycle 50 times >7 | ||
Stone-Stainless steel | Standard condition 48h >10.0 | |
Working temperature | ℃ | -40~100 |
How to Use
1.Dry-hang method: Open a short or long slot at the up and down of the flagstone, the flagstone thickness is commonly 25 ~ 30 mm, slot width is commonly 7~ 8 mm. Put HT611 into slot, and then insert the stainless steel pendant side in the slot, the other side connect to the wall of steel net, steel net is box iron or angle iron
2.Back tied method: punch four circular slot at the flagstone back, put HT611 into flagstone back, insert four metal anchors into the circular slot and link them, fix the flagstone
3.Direct bonding method: Gluing HT611 on the flagstone four corners, then gluing in the center, and then attached the back of flagstone to the wall. This method need high flatness of the wall
Color
A component is white paste, B component is light yellow thixotropic paste, and the mixture is light yellow paste
Storage and usable life
Should be stored below 27℃ in the cool, dry place, this product has a usable life of 12 months from the date of manufacture
Limitations
1.Mix A and B component according to weight ratio 1:1 in a container, then gluing on the bonding slot or surface
2.Curing four hours in room temperature can be structural strength, the totally curing time will be longer in winter
3.The basic material surface temperature should not below 5℃
4.The bonding surface should be dry(moisture percentage should not beyond 15%), no dust, no oil stain. Rough handling must be done when the bonding surface is too smooth
Introduction of Huitian
Established in 1977, Huitian is now one of the biggest adhesive manufacturers in China. There are four manufacturing bases in total, providing high performance adhesives for different industries.
Huitian is a total adhesive solution provider for construction industry, including prodcuts for curtain wall, stones, insulating glass, doors and windows.
Huitian's construction adhesives have been widely used in big construction projects and are well reviewed.
Besides construction adhesives, Huitian also provides many others kinds of products for different industries, transportation, electronics, photovaltaic, etc.
Huitian is your reliable partner and satisfy your need of adhesives!